E6 · Technical centre
How long does it take to qualify a new material?
Direct answer
In compounds and cable, the typical cycle is three to six months between sample, laboratory work and production validation.
Technical detail
For polyester catalyst, it can be six to twelve months because it involves reactor testing. These are industry estimates, not commitments.